Mikvah Construction
Capital Cladding were instructed to supply and fit the full build up and cladding to the top floor.

Location
London, UK
Sector
Residential
Materials used
Metal Cladding
Completion
2024
The project includes the demolition of the existing buildings and the construction of a four-storey Mikvah – a much-needed facility for the local community.
The building will extend from a habitable basement to three levels over ground including a plant room at second floor level. Once complete, the building will be fitted out with 44 private bathrooms and six Mikvah pools evenly distributed between the three lower floors.






Talk to our team of specialists
If you need a façade that delivers on performance, safety, and design, our team is ready to help.